We cover the entire electrical part of a construction project — from laying cables during the shell stage through fitting distribution boards to inspections and handover. We work with a certified inspection technician and all installations comply with the applicable standards.
What we provide
- High-voltage wiring (LV)
- Low-voltage systems (data, intruder alarm, fire alarm, CCTV)
- Distribution boards and their installation
- Lightning protection and earthing
- LED lighting and controls
- Smart home and KNX solutions
- Initial and periodic inspection
Project sequence
- 01
Consultation and survey
We go through the construction drawings with you, identify needs and propose the optimal layout.
- 02
Quote
We prepare a detailed itemised budget with a clear material specification.
- 03
First-fix installation
Laying cables, boxes and conduits before plastering. Coordination with the other trades.
- 04
Final installation
Fitting sockets, switches, light fittings, distribution boards and end devices.
- 05
Inspection and handover
Initial professional inspection and test, issuing the inspection report and handing over the work.
Frequently asked questions
Do you carry out inspections without doing the installation?
Yes, we provide initial and periodic professional inspections and tests for buildings we did not construct.
What is the difference between high and low voltage?
High voltage is the usual 230/400 V wiring for appliances and lighting. Low voltage covers data, telephone, camera, security and fire systems with voltages up to 50 V.